Audience
Any user of the Migration App.
Question
How many concurrent migration commands can run on my domain?
Answer
By default, all domains are set for a maximum concurrency of 4 jobs.
Background
Some customers run multiple jobs concurrently. This is not a problem, but overloading the Agent with more than 4 jobs at one time tends to cause issues on the back end and dramatically reduces performance.
To keep migrations running smoothly, we have designed Migration App to automatically stop any migration job that exceeds the maximum concurrency for that domain. If you attempt to initiate a job beyond the limit, the job will fail and you will see the following error message.
"You have exceeded the defined limit for the number of jobs running at one time. You may only run four jobs concurrently. Please pause one or more migration jobs."
Questions? Feature Requests? Other Feedback?
If you have feature suggestions or requests, feel free to submit them here, and make sure you mention Migration App in the text.
For more complex requests that would benefit from providing screenshots or other attachments, you may submit them to support@egnyte.com. Be sure to include Migration App in the email title. Our Support team will push your comments to the Product team for consideration.